We are having to dig down about 24-36" past the sub-base on #8 trying to remove all the garbage that the green was built with. We were pulling out roots, stumps, and just straight black muck. This area was humping and not setting up so we have to dig it all out and replace it with clean compactable fill. This could have developed over time or at least made worse by the poor drainage grading in this green.
No comments:
Post a Comment